Map of data center opportunities in Finland
This database is constantly evolving and new opportunities are updated. Use the filters to identify the most potential opportunities for your company.
Data centers
Kemintulli
Kemintulli site is a greenfield location owned by Kemi city.
Site is next to E8 hiway within 5 minutes drive to Kemi city, 10 minutes drive to Kemi airport and 10 minutes drive Kemi deep port (12m).
In the region, there is skilled IT professionals as well as educational institutions in the applicable fields.
Cool nordic climate.
Regulatory readiness
Zoning readiness
Zoning ready for data center useSite area, environment, planning and permitting
Building right / [m2]
41 000Building right can be extended up to / [m2]
89 000Site area / [m2]
82 000Site area can be extended up to / [m2]
179
Natural water source available for cooling
AvailableIf yes, distance to water source / [meters]
100Greenfield site specifics
Type of ground
Soil is moraine.
Layout plan of datacenter building(s)
Preliminary plan exitsBrownfield site specifics
Control of hazard
Natural risks
No natural risks
Proximity of major roads, airports, flight paths and railways
7 minutes to the Kemi-Tornio airport, 6 minutes to the harbour of Kemi and 5 minutes to the railway station of Kemi.
Safety, security and accessibility
Current access to the site
One roadEmergency vehicle accessibility
Ok.
Distance to nearest international airport / [km]
8Distance to nearest fire & rescue station / [km]
5Distance to nearest police station / [km]
4Distance to nearest hospital or health care center / [km]
5Availability of public transportation
Yes.
Electrical power supply
What is needed to realize total power supply?
A new power station 110 / 20 kV and a connection to 110 kV power grid owned by Enso Alueverkko Oy.
Lead time for total power supply to the site / [months]
18Redundancy power availability
Not availableDistance to 110 kv power connection point / [km]
3First phase power supply
First phase electricity power supply (in 18 months or sooner)
4-6 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
10 kVGeneral power supply information
Local green energy
AvailableDetails on local green energy (suppliers)
Ikea windmills on Ajos harbour.
Operational specification: connectivity
Amount of diverse connections
2Connectivity supplier(s) to provide diverse connectivity
Elisa Oyj
Dark fiber on the site
AvailableLead time for minimum of two connections / [months]
1Distances to local internet exchange points (ix) in Finland
110Operational specification: utilities
District heating network
Not availableDistance to district heating network / [km]
5Notes on (liquid) natural gas
LNG terminal is uder construction in Tornio, 25 km.
Local ecosystem to support in construction and operation
Availability of skilled laborforce
Competent work force available; Lapland University of Applied Sciences Kemi site is situated only 5 kms from the site.
Contact information
Person(s) responsible for provided information
Päivi Keisu (Project manager)
paivi.keisu@digipolis.fi
+358469202552