Map of data center opportunities in Finland

This database is constantly evolving and new opportunities are updated. Use the filters to identify the most potential opportunities for your company.

Data centers KyroCloud Park

Data centers

KyroCloud Park

KyroCloud Park
Prime Industrial Site for Data Center Development

Location Advantage:
Strategically positioned in Finland with excellent access to road, rail, and international air transport. The site supports rapid deployment and benefits from strong local support and development readiness.
 
Zoning & Expansion:
  • Fully zoned for industrial use
  • Initial area: 22+ hectares, expandable up to 39 hectares
  • Efficient permitting process enables fast construction start

Infrastructure Highlights:

  • Building efficiency ratio of 0.5, allowing ~19.6 ha of buildable space
  • Access to up to 120 MW of electricity (future capacity: 240 MW) from nearby 110 kV line
  • District heating network nearby enables waste heat recovery
  • River cooling option with added winter benefits

Ideal for Data Centers:

  • Robust power availability
  • Sustainable and efficient cooling solutions
  • Strong connectivity and logistics infrastructure
Address: Kivikatu 10, 61500 Isokyrö, Finland
Coordinates: 62.994291, 22.296425
Owned by:
Type: Greenfield
WWW:

Zoning readiness

Zoning ready for data center use

Building right / [m2]

70 000

Building right can be extended up to / [m2]

125 000

Site area / [m2]

140 000

Site area can be extended up to / [m2]

390 000

Notes on site size and building permit

A building permit may now be issued without delay, within the building rights

Design rules and regulations

The building has to fit into its environment

Pre-approval of construction and environment permits, fire and rescue plan

Negotiations not started

Site shape

Almost a square

Notes on site topography

Gentle slope

Prevailing wind directions

South-west and west

Natural water source available for cooling

Available

If yes, distance to water source / [meters]

1 800

Notes on cooling options

River + possibility of using a district heating network for cooling

Type of ground

Bedrock

Levelling of plot

Plot is not construction ready / levelled

Type of forestry (if plot not levelled)

Pine forest and clearing

Layout plan of datacenter building(s)

No plan

Natural risks

No

Proximity of major roads, airports, flight paths and railways

Major roads 0,3 km, airports 30 km, railway 10 km

Proximity of hazardous industries

No

Proximity of near by communities

> 1 km

Current access to the site

Two or more roads

Notes on current and planned access to the site

Easy

Emergency vehicle accessibility

Easy

Distance to nearest international airport / [km]

33

Distance to nearest fire & rescue station / [km]

3

Distance to nearest police station / [km]

38

Distance to nearest hospital or health care center / [km]

3

Availability of public transportation

Bus and train

What is needed to realize total power supply?

Due to transformer availability at least 14 months

Lead time for total power supply to the site / [months]

14

Redundancy power availability

Available (less than total main power feed)

Arrangement of redundancy power

(bio)diesel,biogas aggregate or building new grid to different 110 kv line

Distance to 20 kv power connection point / [km]

1

Distance to 110 kv power connection point / [km]

3

Distance to national grid substation, 400 kv / 110 kv / [km]

8

First phase electricity power supply (in 18 months or sooner)

1-3 MW

First phase power supply to the site

0 - 18 months

First phase electrical feed to the site

20 kV

First phase redundancy power availability

Available (delivery time is longer than 18 months)

Local green energy

Available

Details on local green energy (suppliers)

Wind power

Local electricity supplier(s)

Vaasan Sähkö Ltd

Distance to optical fiber infrastructure / [km]

0.2

Distance to optical fiber infrastructure / [miles]

0.124274

Amount of diverse connections

2

Connectivity supplier(s) to provide diverse connectivity

Telia Finland Oyj [1475607-9]

Cinia Oy

Elisa Oyj

Arrangement of connection diversity

Building connections from different directions

Dark fiber on the site

Available

Lead time for minimum of two connections / [months]

2

Distances to local internet exchange points (ix) in Finland

220 km to TREX (Tampere), 315 km to FICIX-3 (Oulu), 400 km to FICIX-2 (Helsinki), 405 km to FICIX-1 (Espoo)

Commitment of local utility companies

Ongoing planning and investment readiness exists

Water utilities on site

Potable water supply available; Waste water sewage available; Storm water drainage available

Notes on water utilities

An almost unlimited amount of water is available and, if necessary, can be purified from a nearby river

District heating network

Available

Distance to district heating network / [km]

0

Opportunities to utilize waste heat

District heating plant is happy to buy waste heat

Distance to delivery point / [km]

2

Other cost benefits

Solid rock soil and affordable property taxes

Notes on local ecosystem

Great interest in using renewable energy, utilizing waste heat and sustainable development.

Availability of skilled laborforce

Good availability, jobs in this field are attractive

Higher education resources

Excellent, many universities in the area

Person(s) responsible for provided information

Jenna Hoffrén

jenna.hoffren@vaasafacilita.fi

+358 400 282 440

Jouko Vuolle (Toimitusjohtaja)

jouko.vuolle@isonkyronkehitys.fi

+358 50 375 5790

Availability

For sale

Site address

Kivikatu 10, 61500 Isokyrö, Finland